Prime AV Solutions runs stage & truss fabrication across Delhi and the rest of Delhi NCR. Own NCR base with warehousing across Okhla, Noida and Gurugram, which also makes Delhi the dispatch origin for Jaipur, Agra, Lucknow, Gwalior, Ludhiana and Amritsar. Every project is specified and quoted to its own brief.
- Lead time
- From 6 weeks
- Peak season
- Oct–Mar
- Coverage
- Delhi & Delhi NCR
Key takeaway
Stage & Truss Fabrication for Delhi’s biggest events
Structure is the one department where getting it wrong is not an aesthetic problem. Every stage and truss build starts from a load case: the dead load of the structure itself, the live load of performers and crew, the suspended loads of lighting, audio and LED, and — outdoors — wind load on any banner, roof or solid surface. We specify from manufacturer load tables for the exact truss type and span, with chain hoists rated well above the working load and point loads calculated per leg. Decks are Layher or aluminium framed systems with a published uniform load rating, and a performance stage is typically designed for 500 kg per square metre of distributed live load.
Everything here is set by the building and the ground: documented rigging capacity, floor loading, ceiling trim and whether there is room for towers to carry load to the floor. In Delhi that plays out at venues like Bharat Mandapam, Yashobhoomi, JLN Stadium, and across Connaught Place, Aerocity, Chattarpur, Vasant Kunj.
Ground support and roof systems are where wind becomes the governing factor. A solid or banner-clad roof is a sail, and the force on it rises with the square of wind speed, so every roof design comes with a wind management plan: a speed at which banners are removed, a higher speed at which the roof is lowered or the show stops, and a ballast or ground-anchor scheme calculated for the site's surface. Ballast is not a number we guess — concrete blocks or water ballast are specified against the structure's overturning calculation, and soft ground needs load-spreading plates or a different anchoring approach entirely.
What’s included
- Layher & aluminium deck stages
- Ground support & roof systems
- Motorised chain hoists
- Structural load calculations
Equipment we carry
Why Delhi chooses Prime AV
- Crews and trucks positioned for fast load-in at Siri Fort Auditorium and venues in Vasant Kunj and Dwarka.
- We require written sign-off on point loads and, where it is not forthcoming, quote a ground support system that carries its own load to the floor.
- Signed build completion and pre-doors structural check record
- Working knowledge of Delhi NCR venue rules, power sanctions and permission timelines.

Local conditions
Producing stage & truss setup in Delhi
Weather & the rig
Structure is the department wind and rain act on directly — a clad roof behaves as a sail, ballast sinks into saturated ground, and the wind plan is written against the site's actual conditions. Two distinct problems bracket the season. From mid-December through January, radiation fog drops visibility under 100m and turns projection milky at any useful throw, while 3–5°C call times slow LCD response on monitors and stress LED driver boards before the first cue. Then from late October the post-harvest smoke layer pushes AQI past 400, which hazes beams attractively to the eye and reads as dirty grey on camera, so broadcast-led shows have to light for the haze rather than through it. May and June bring 45°C and loo winds that load filters within a session. Jul–Sep monsoon, where the real hazard is not rainfall volume but the short violent pre-rain squall that arrives in ten minutes and takes down an untethered outdoor structure; mid-Dec to late Jan if the design depends on projection throw.
Power & redundancy
Motorised hoists and the loading sequence need a reliable supply early in the build, well before the event distribution is energised, so structure usually works off its own temporary feed. NDMC, BSES and Tata Power supply in Lutyens, Aerocity and Dwarka is strong enough to run a conference on house power. The farmhouse belt is the opposite: Chattarpur and Mehrauli events are DG-primary, typically a synchronised pair of 250 kVA silent sets with auto-changeover. The complication unique to Delhi is GRAP — once the Commission for Air Quality Management escalates to the higher stages in winter, diesel generator use is curtailed unless the set is retrofitted or dual-fuel, so a December outdoor show needs its power strategy approved before the stage design is signed.
Permits & noise rules
Stages, roofs and ground support frequently need structural sign-off and local authority approval in their own right, separate from the event permission itself. Amplified sound and temporary-structure NOCs route through the Delhi Police Licensing Branch, with ground permission from MCD, NDMC or DDA depending on whose land it is, and a Delhi Fire Service NOC for any pandal or raised structure. DPCC applies the noise rules and the 10pm loudspeaker cut-off. Drone operation is close to impossible on a normal timeline: most of the city falls inside the IGI red zone or a VVIP restriction, and anything beyond that needs clearance that goes well past a Digital Sky permission.
Load-in & access
Truss, decks and ballast are the heaviest and bulkiest loads on the job and must arrive first, which makes gate width, ground bearing and crane or forklift access the controlling constraints. Goods-vehicle restrictions keep trucks out of much of the city through the day, so inventory moves from Okhla, Noida or Gurugram warehousing after 11pm. Pragati Maidan is easier since the tunnel opened, but ITPO gate passes have to be lodged days ahead. Yashobhoomi has purpose-built docks. The genuine trap is the farmhouse circuit, where a single narrow gate is shared with guest arrival, so load-in must be finished and the gate cleared before the first car turns in.
Season & booking
India International Trade Fair at Pragati Maidan through the second half of November absorbs every truss section, rigger and forklift in the NCR. Republic Day locks central Delhi for most of January with rehearsal closures from early in the month, state visits close roads without notice, Diwali week empties the labour pool, and the November-December and February muhurat clusters book out the farmhouse belt a year ahead. Peak demand runs Oct–Mar.
Crew & dispatch
Own NCR base with warehousing across Okhla, Noida and Gurugram, which also makes Delhi the dispatch origin for Jaipur, Agra, Lucknow, Gwalior, Ludhiana and Amritsar. Load-in support covers Vasant Kunj, Dwarka and the rest of the city.
What it costs here
The deepest supplier pool in the country sits here, which makes Delhi the cheapest place in India to hire kit — a comparable conference rig quotes well below its Mumbai equivalent — and clients negotiate accordingly. The margin lives in engineering, crew quality and compliance paperwork, not in equipment day rates.
Local expectations
Protocol is the deliverable at government and diplomatic events: dais seating order, the lamp-lighting sequence, anthem cues, correct honorifics in the script and a VIP arrival time that will move by forty minutes without warning. Bilingual Hindi and English scripting is assumed, as is a clean press feed. Punjabi weddings here expect high SPL and a finish past the curfew, which is why experienced producers push those clients towards acoustically contained indoor venues rather than fighting the enforcement.
Specification
Stage & Truss Fabrication: technical specification
| Specification | Detail |
|---|---|
| Deck systems | Layher Allround and aluminium-framed modular decks with published load ratings |
| Live load design | Typically 500 kg per square metre distributed for performance stages |
| Truss types | 300 – 600 mm box and triangular truss, specified from manufacturer span and load tables |
| Chain hoists | Electric hoists in 500 kg – 2 t capacities, rated well above working load, inspected per build |
| Rigging safety factor | Hardware used within rated capacity with the factor appropriate to lifting over people |
| Roof systems | Ground support and mother-grid roofs with a documented wind management plan |
| Wind thresholds | Staged limits for banner removal, roof lowering and show stop, set per structure and site |
| Ballast | Concrete or water ballast calculated against the overturning case, with load-spreading on soft ground |
| Stage heights | 0.6 m to 2.4 m with code-compliant stairs, handrails and edge protection |
| Documentation | Load calculations, point-load report, hoist inspection records and a build sign-off |
The rigging discipline on site is what turns a design into a safe build. Hoists are inspected, chains checked for wear, steels and shackles used within rated capacity with a safety factor appropriate to lifting over people. Every hang point is bonded, every hoist is controlled from a single position, and nothing moves while people are underneath. We run a pre-show structural check after the full rig is loaded and again before doors, because a structure that was correct when empty can reveal a problem once 2 tonnes of lighting and LED is on it. The build sequence, the bolt torque, the hoist inspection and the final sign-off are all documented.
Sizing
What size rig does your event actually need?
| Scale | Guests | Recommended setup |
|---|---|---|
| Conference stage | 200 – 600 | 10 m x 6 m deck at 0.6 m, front truss on two uprights, 1 t suspended load |
| Wedding stage | 400 – 1,200 | 12 m x 8 m deck at 0.9 m with ramps, four uprights and a decor-integrated grid |
| Launch stage | 1,000 – 3,000 | 16 m x 10 m deck at 1.2 m, ground support grid, 3 – 5 t suspended load |
| Concert stage | 5,000 – 15,000 | 18 m x 12 m deck at 1.8 m, roof system, PA wings, 10 – 15 t suspended load |
| Festival main stage | 20,000+ | 24 m x 16 m with 2.4 m deck, engineered roof, mother grid, ballast and wind plan |
Scope
Stage & Truss Setup scope tiers in Delhi
Modular Stage
Conference and wedding stages up to 100 sq m with a front truss
- Modular deck stage with skirting, stairs and edge protection
- Front and side truss on uprights with load calculations
- Point-load report issued to the venue
- Certified rigging crew and hoist inspection records
- Build and strike within the venue's load-in window
Ground Support System
Concert and launch stages, 150 – 400 sq m with a flown grid
- Ground support towers and a mother grid rated for the full rig load
- Motorised chain hoists with a single controlled lifting position
- Structural calculations covering dead, live and suspended loads
- Ballast scheme calculated against the overturning case
- Crew chief, certified riggers and a documented build sequence
Roof & Custom Structure
Festival stages, outdoor concerts and bespoke scenic structures
- Engineered roof system with a site-specific wind management plan
- Staged wind thresholds for banner removal, lowering and show stop
- Ground anchoring or ballast designed for the actual surface
- Pre-show structural checks after loading and again before doors
- Full rigging department with a nominated competent person on site
The deepest supplier pool in the country sits here, which makes Delhi the cheapest place in India to hire kit — a comparable conference rig quotes well below its Mumbai equivalent — and clients negotiate accordingly. The margin lives in engineering, crew quality and compliance paperwork, not in equipment day rates.
Venues
Where we work in Delhi
| Venue | Capacity | Production note |
|---|---|---|
| Bharat Mandapam | Around 7,000 in the plenary hall with multiple halls across the ITPO complex | Everything goes through the ITPO process — gate passes, approved-vendor paperwork and security screening of every case — so the build calendar has to start 72 hours before a build that would take one night anywhere else. |
| Yashobhoomi | Around 11,000 in the main auditorium plus very large convention and exhibition halls | The sheer footprint is the constraint: control positions end up a long way from stage, so fibre and signal distribution rather than copper multicore decides whether the design works. |
| JLN Stadium | Around 60,000 in the bowl, with the infield used for staged events | SAI holds the approvals, the athletics track and infield need full protection boarding, and the roof carries no event rigging at all, so even a modest stage needs ground-support towers with ballast calculations. |
| Siri Fort Auditorium | Around 1,200 seated | A fixed proscenium house with house rigging and a locked projection throw, so any design that wants a different screen position has to solve it with ground support in the wings. |
| Chattarpur farmhouse venues | Typically 1,000–5,000 across lawns and covered structures | Driveways are gravel or kutcha and will not take a loaded trailer without ground-protection boards, and almost every one of them is generated end to end with no usable house feed. |
Crew
Who turns up on show day
- Structural designer
Produces the load case and the calculations, specifies truss and hoist capacities and signs the point-load report.
- Crew chief
Owns the build sequence and the clock, and holds the authority to stop the build if anything departs from the drawing.
- Lead rigger
Inspects hoists and hardware, controls all lifting from a single position and signs off before anything goes to trim.
- Stage carpenter
Builds decks to level, fits stairs, handrails and edge protection, and closes every gap a heel or a cable could find.
- Competent person on site
Performs the structural checks after loading and before doors, and owns the wind management decisions on an outdoor roof.
What you receive
- Structural load calculations covering dead, live, suspended and wind cases
- Point-load report per leg issued to the venue or structural engineer
- Stage and truss CAD drawing with dimensions, heights and trim
- Hoist and rigging hardware inspection records for the build
- Ballast or ground-anchoring scheme with the overturning calculation
- Wind management plan with staged thresholds for outdoor roof systems
- Signed build completion and pre-doors structural check record
Timeline
From enquiry to load-out
- T-6 weeks
Load case and design
Dead, live, suspended and wind loads established from every department's requirements, then truss and hoist capacities specified.
- T-4 weeks
Calculations issued
Structural calculations, point-load report and ballast scheme sent to the venue or the appointed structural engineer for sign-off.
- T-3 weeks
Site and ground assessment
Surface bearing capacity, levels, access routes and anchoring feasibility checked on site for outdoor builds.
- Show day −3 to −1
Build
Decks, towers, grid and roof built in documented sequence with bolt torque and hoist inspection recorded.
- Show day −1
Load and structural check
Departments load the grid, then a structural check is performed with the rig in place and again before doors.
- Show +4 to +24 hours
Strike
De-rig in reverse build order with lifting operations supervised and the area cleared of all other crew.
Risk control
What goes wrong, and how we stop it
What can go wrong
How we prevent it
- What can go wrong
The venue quotes a rigging capacity that turns out to be an assumption rather than a calculation.
How we prevent itWe require written sign-off on point loads and, where it is not forthcoming, quote a ground support system that carries its own load to the floor.
- What can go wrong
Stage gaps and unprotected edges become an injury risk once performers and guests are moving fast.
How we prevent itDeck gaps are closed and taped, edge protection and handrails are fitted to code, and the carpenter walks the whole deck surface before anyone is allowed on it.
- What can go wrong
Lifting continues while other crew work underneath because the build is behind schedule.
How we prevent itAll lifting is controlled from a single position with the area cleared, and the crew chief has explicit authority to stop a build that is being rushed.
- What can go wrong
Departments add lighting, LED and audio beyond the load the grid was designed for.
How we prevent itA single suspended-load budget is published at T-4 weeks and every department's weight is booked against it; anything added later triggers a recalculation before it is hung.
Honest comparison
Is this the right choice for your event?
- Lower stage height to save cost and build timeOur verdict
Often a good call indoors where the audience is close. On a deep standing audience, a 0.6 m stage means the back two thirds see nothing, and IMAG screens become the only reason they stay — which costs far more than the deck did.
- Ground support towers instead of flying from the venue structureOur verdict
Ground support costs more and eats floor space, but it carries its own load to the floor and removes any dependence on a venue capacity you cannot verify. Where the venue has documented, engineered rigging points, flying is cheaper and cleaner.
- Scaffold stage instead of a modular deck systemOur verdict
Scaffold is cheaper and infinitely adaptable, and for a long-run outdoor build on uneven ground it is often the sensible choice. Modular decks are faster, flatter, quieter underfoot and look finished without extra cladding.
Demand
What Delhi books most
Delhi event mix
- Government, ministry and multilateral summits
- Trade exhibitions and industry association conventions
- Large farmhouse and hotel weddings
- Corporate conferences, dealer meets and award nights
- Product launches and auto reveals
- Political rallies and public functions
Ideal for
Events we power with stage & truss fabrication in Delhi
Process
From brief to standing ovation
01
Brief & recce
We visit the venue, map power and rigging, and understand your show flow.
02
Design & quote
CAD plans, 3D previews and an itemised quote within 24 hours.
03
Build & rehearse
Load-in, system tuning, content checks and full technical rehearsal.
04
Show & strike
Show-caller-led execution, then a quick, clean load-out.