Key takeaway
Key takeaways
- Protocol-aware crew
- Redundant PA & power
- Large public screens
- Interpretation for delegations
Government & Public Events: AV checklist
Scope
- Protocol-aware crew
- Redundant PA & power
- Large public screens
- Interpretation for delegations
Power & backup
- Silent generator with automatic changeover sized to the full rig
- UPS protection on consoles, media servers and switchers
- Spare microphones, cables and a spare radio channel held in reserve
Run of show
- T−4 days — Site build
- T−2 days — Crew clearance and access
- T−1 day — Full rehearsal with protocol
- T−6 hrs — Anti-sabotage check and lockdown
- T−90 min — Crew in position
- 10:00 — Guest seating
- 10:30 — Arrival and national anthem
- 11:30 — Addresses and inauguration
What you will be judged on
- The arrival and the national anthem ran exactly to the protocol office's order, with no music or cue out of place.
- Every dignitary was clearly audible from the podium and on the press feed, with no dropout in front of the dais.
- The public seated beyond the enclosures could both hear the addresses and see them on screen.
- Press and broadcast received a usable clean feed and left without needing to re-record anything.
- Delegations followed the proceedings on their own language channel, and accessible seating had a clear screen sightline.
What this prevents
What can go wrong
How we prevent it
- What can go wrong
The speaker sequence changes after the dignitaries have arrived.
How we prevent itBuild the cue sheet so segments are independent and reorderable, keep the show-caller beside the protocol officer throughout, and have the graphics and screen operator working from live text fields rather than baked video.
- What can go wrong
Crew passes are not cleared in time and technicians cannot enter.
How we prevent itSubmit the crew list, identity documents and vehicle details well before the deadline, nominate a cleared deputy for every critical position, and keep the list short and fixed rather than adding names late.
- What can go wrong
The venue locks down hours before the function and nothing further can be brought in.
How we prevent itTreat the lockdown hour as the real deadline: complete all testing, place every spare inside the cordon, and station crew at each position before the sweep rather than planning to walk back out.
- What can go wrong
The podium microphone becomes a single point of failure.
How we prevent itRun a second microphone on the podium, permanently open and mixed low on a separate wireless system and separate receiver, so a failure is inaudible to the audience rather than a visible pause.
- What can go wrong
The public crowd substantially exceeds the enclosure estimate.
How we prevent itDesign coverage with an overflow zone, pre-plan one additional delay position and screen that can be added in a day, and agree with the administration how the overflow area is served and marshalled.
- What can go wrong
Interpretation channels or receivers are unallocated on the day.
How we prevent itConfirm delegation languages and head counts in advance, number receivers against a distribution and collection register at the entry point, and brief the protocol team on which channel carries which language.
Tailor it to your event
Get an itemised quote from Prime AV Solutions within 24 hours — call +91 93093 80958 or WhatsApp our producers.
Published 14 September 2026 by the Prime AV Solutions production team.