Exhibitions & Trade Shows: AV checklist
Scope
- Booth LED & touchscreens
- Keynote stage PA
- Pavilion lighting
- Content playback
Power & backup
- Silent generator with automatic changeover sized to the full rig
- UPS protection on consoles, media servers and switchers
- Spare microphones, cables and a spare radio channel held in reserve
Run of show
- T−48 hrs — Marshalling and load-in slot
- T−36 hrs — Structure and power
- T−24 hrs — LED and screen build
- T−12 hrs — Content and brightness set
- T−2 hrs — Handover to the stand team
- 10:00 — Hall opens, day one
- 12:30 — Keynote stage session
- 17:00 — Hall closes
What you will be judged on
- The stand was live and tested before the hall opened on day one, not during the first visitor hour.
- Screens and content ran all three days without a visitor ever seeing a desktop, an error or a black panel.
- The stand team could start, stop and recover the system from a single printed page without calling anybody.
- Neither the organiser nor a neighbouring exhibitor raised a complaint about power draw or audio spill.
- Content read clearly on camera and in photographs taken under hall lighting with the doors open.
What this prevents
What can go wrong
How we prevent it
- What can go wrong
The booth trips and takes a section of the hall's phase with it.
How we prevent itCalculate draw per circuit honestly, order the correct feed from the appointed contractor, balance across phases, and put inrush-heavy LED and lighting on separate protected circuits with their own breakers.
- What can go wrong
The power order is placed at half the real load to save money.
How we prevent itProduce a written load schedule per device at design stage, size the order to measured draw plus headroom, and treat the contractor's feed cost as fixed infrastructure rather than a negotiable line.
- What can go wrong
Content arrives in the wrong aspect for a non-standard LED canvas.
How we prevent itIssue the exact pixel canvas map and safe area to the content team at briefing, and test the real files on the real processing during the build rather than on a laptop.
- What can go wrong
The truck sits in the marshalling queue and the build window shrinks.
How we prevent itBook a load-in slot, load in build order with numbered cases, and send a small advance team to secure the footprint while the vehicle waits its turn.
- What can go wrong
Booth audio spills and the organiser orders it switched off.
How we prevent itDesign short-throw, downward-facing coverage over your own stand area, set a measured level at the stand boundary, and use directional or near-field speakers rather than a pair of full-range boxes.
- What can go wrong
The system does not come back after an overnight hall power event.
How we prevent itSet players and processors to auto-power-on and auto-play, schedule start-up before hall opening, and keep a small uninterruptible supply on anything with a long boot sequence.
Tailor it to your event
Get an itemised quote from Prime AV Solutions within 24 hours — call +91 93093 80958 or WhatsApp our producers.