Key takeaway
Key takeaways
- Outdoor weatherproof rigs
- Silent generators & backup
- Travelling crew logistics
- Live band PA
Destination Weddings: AV checklist
Scope
- Outdoor weatherproof rigs
- Silent generators & backup
- Travelling crew logistics
- Live band PA
Power & backup
- Silent generator with automatic changeover sized to the full rig
- UPS protection on consoles, media servers and switchers
- Spare microphones, cables and a spare radio channel held in reserve
Run of show
- T−5 days — Trucks dispatch
- T−3 days — Load-in and structure
- T−1 day — Rehearsal and weather review
- 16:00 — Pre-function checks
- 18:30 — Welcome function
- 20:00 — Main function
- 21:30 — Finale
- T+1 day — Strike and reload
What you will be judged on
- Every outdoor function went ahead on its intended site, or moved to a wet-weather plan that was already rigged and looked intentional.
- Nothing failed that could not be replaced on site from the spares the crew brought with them.
- The property was handed back without damage, and the resort would host the same production team again.
- Guests never saw a speaker, a cable or a generator in a photograph.
- The finale went up on schedule with the permissions in hand and no last-minute negotiation.
What this prevents
What can go wrong
How we prevent it
- What can go wrong
Rain arrives on the day of the lawn function.
How we prevent itRig the wet-weather alternative in parallel rather than promising it, agree a named decision-maker and a fixed decision time with the planner, and keep covers and squeegee crew on site for every outdoor build.
- What can go wrong
A loaded truck cannot reach the property's final approach.
How we prevent itDrive the actual route at the recce, measure gate widths, turning circles and bridge limits, and plan transhipment to smaller vehicles or tractors before dispatch rather than on arrival.
- What can go wrong
The resort refuses rigging points you had designed around.
How we prevent itGet rigging, drilling and generator-placement permissions in writing at the recce, and design free-standing ground support as the default so no structural element depends on the building.
- What can go wrong
A single piece of equipment fails with no replacement within four hours.
How we prevent itCarry redundancy for every show-stopping item, including a second console, spare amplification, duplicate radio channels and a full consumables kit, and treat the spares manifest as part of the technical design.
- What can go wrong
Resort power is shared with two hundred occupied guest rooms.
How we prevent itSize silent generators for the full event load independent of the property supply, place them on an acoustic screen away from rooms, and test the changeover under load before guests arrive.
- What can go wrong
A drone show or late music runs into local restrictions nobody checked.
How we prevent itConfirm airspace status, noise hours and any heritage-property conditions with the local authority weeks ahead, in writing, and design the finale around what is actually permitted at that location.
Tailor it to your event
Get an itemised quote from Prime AV Solutions within 24 hours — call +91 93093 80958 or WhatsApp our producers.
Published 12 December 2025 by the Prime AV Solutions production team.
